SP 80 Montanina, Velo d'Astico

Hydraulic engineering works to restore the collapsed embankment of provincial road 80 Montanina at Velo d'Astico (Vicenza).

Location
Velo d'Astico (VI)
Scope
Hydraulic engineering works on a road embankment
The SP 80 Montanina site after completion of the works

The project

ClassA = SN 8
Diameter1200 mm
Quantityapprox. 30 m

Site challenges

  • Extreme gradients and complex terrain
  • Infiltration and surface runoff
  • Partially active landslide
  • Obsolete existing pipelines
The collapsed SP 80 Montanina embankment
SP 80 Montanina, Velo d’Astico: the collapsed road embankment before the works
Design solution for the SP 80 embankment
SP 80 Montanina, Velo d’Astico: diagram of the design solution for the embankment
Laying the PALADEX pipe in the new embankment
SP 80 Montanina, Velo d’Astico: laying the PALADEX pipe
PALADEX DN 1200 pipeline in the SP 80 embankment
SP 80 Montanina, Velo d’Astico: the PALADEX DN 1200 pipeline in the new embankment
The SP 80 Montanina site after completion of the works
SP 80 Montanina, Velo d’Astico: the site after completion of the works