A96 motorway, Bavaria
Sedimentation plant built from PALADEX DN 2200 elements for road runoff drainage along the A96 motorway in Bavaria, installed in September 2018.
- Location
- A96, Bavaria (Germany)
- Scope
- DN 2200 sedimentation plant
- Year
- 2018
The project
| Internal diameter | 2200 mm |
|---|---|
| Structure | Sedimentation plant |
| Installation | September 2018 |
The plant elements, with inlet, outlet and inspection openings already prepared at the plant, were handled with excavators and laid in the trench alongside the carriageway.
PALADEX pipes
Urban drainage and stormwater